Get the latest price? We will reply as soon as possible (within 12 hours)

Production equipment

About Us

 Our factory currently has two production areas. The first batch of processing equipment went into production in 2008, and the second batch in 2018. 

We possess various CNC vertical lathes, horizontal lathes, machining centers, gantry milling machines, drilling machines, etc.,

 Ensuring the processing accuracy and requirements of crushers and parts. 

Our factory also provides test benches for crushers to ensure stable operation of each piece of equipment before it leaves the factory.



44_看图王(1)--===.jpg


11_看图王(1).jpg


22.jpg


77.jpg


55.jpg


330_看图王.jpg


88_看图王.jpg